Drill Driver,Battery Drill,Impact Driver Bits,Ryobi Hammer Drill Suzhou ZhaoCheng lithium technology Co., Ltd. , https://www.scans-tools.com
The planned location of Echeng New District is in the east of the main urban area. It starts from the bridge connecting line, east to Longwangzui, north to the Yangtze River, south to the intercity railway and the southeast corner of the intercity railway and bridge connecting line. The total land area is 26 square kilometers.
In April, the Municipal Planning Bureau publicly collected the conceptual planning plan for the new district project nationwide. This time, the conceptual planning and design plan for the Echeng New District will be listed in the Shanghai Branch of the British Atkins Co., Ltd., the School of Architecture and Urban Planning of Huazhong University of Science and Technology, and the Shenzhen Branch of the China Urban Construction Research Institute. unit. It is reported that in the future, all large and medium-sized planning projects in the city will be conducted in the form of invitations.
On June 18th, the preliminary evaluation meeting of the conceptual planning and design plan for the Echeng New District was held in the Municipal Planning Bureau, which marked the full launch of the construction of the Echeng New District. The construction of the Echeng New District is a major strategic deployment of the municipal party committee and municipal government this year. It is an important part of the “one heart and four pieces†of the main city. The new district will follow the “One Heart and Four Parks†(Echeng District Administrative Center, Port Economic Park, Regional Logistics Park, The functional positioning of the Diamond Tool Park and the Business Support Service Park has become a high-quality, modern sub-center of the main city.