This paper introduces the functions and significance of the AFPM100 fire equipment power status monitor through the introduction of the Baodi Spa Spa Resort project.
Yang Junjun

Ankerui Electric Co., Ltd. Shanghai Jiading

1 Introduction

China Hardware Business Network

The Baodi Spa Hot Spring Town Project is located in the hot spring planning area of ​​Dongliang Town, Yimeng County, Fuxin City. It covers an area of ​​about 1,500 mu and has a total investment of about 4.5 billion yuan. It is characterized by characteristic cultural tourism and comprehensive on hot springs. The real estate project integrates leisure tourism, residence, entertainment and green agriculture. The plan is divided into three phases. The first phase will focus on creating environmental landscapes, health hot springs, eco-agricultural greenhouses and hot spring commercial formats, thus improving the project support. The foundation of the construction of Liang Hot Spring City. The Baodi Hot Spring Spa Project is designed and designed by Stowo Architects. The project is based on the principle of “respecting resources, respecting the land and respecting people” and combining the new historical urban culture to design and design a new culture. "The new window." She has integrated eight cultures such as “hot spring culture”, “Hongshan culture”, “tea culture”, “coal culture”, “Buddhist culture”, “agate culture”, “bare culture” and “new celebrity window”. Each culture builds a special exhibition area and forms a cultural industry tour area, allowing people who come here to look forward to a new and prosperous development from the past, the present to the future. The urban agricultural sightseeing area covers an area of ​​300 mu and the building area is about 43,000 square meters. Building agricultural parks, experiencing agricultural parks, popular science education, folk housery and other content, forming a collection of agricultural tourism parks that integrate ecological tourism, green catering, rural accommodation, farming experience, health and wellness, science education, leisure and entertainment, and create a new citizen Outdoor health and leisure base.

2. System requirements analysis

Detecting the overvoltage, undervoltage, phase loss, power interruption and other signals of the fire equipment power supply, sound and light signal alarm, accurately report the fault line address, and monitor the change of the fault point. Store various fault and operational test signals to display system power status.

3. Reference standard

Recently, in order to increase the intensity of power supply monitoring and control of fire-fighting equipment, the state has successively formulated or revised a number of relevant standards and regulations to strengthen the prevention of power supply for fire-fighting equipment. There are:

3.1. GB28184-2011 "Fire Equipment Power Monitoring System".

3.2. GB25506-2010 "General Technical Requirements for Fire Control Room".

4. System composition

The Baodi Spa Spa Resort Project consists of fire equipment power status monitors and sensors. The communication bus of the project is connected to two communication buses. The bus is connected to the wall-mounted background in the fire-fighting distribution box, and the main artery of the fire-fighting equipment power monitoring system is formed. The sensor in the cabinet is powered by 24V DC through the host. The above describes a set of power supply monitoring system for fire protection equipment with stable signal and reliable accuracy. The system networking is divided into three layers:

1) Station management

The management personnel of the station control management team for the fire equipment power monitoring system is the direct window of human-computer interaction and the uppermost part of the system. Mainly composed of system software and necessary hardware equipment, such as display screen, UPS power supply and so on. The monitoring system software calculates, analyzes and processes various types of data information on the site, and responds to the on-site transportation situation by means of text, digital display, sound, and indicator light.

Monitoring host: used for data collection, processing, and data forwarding. Provides data interfaces for system management, maintenance, and analysis within and outside the system.

UPS: Ensure the normal power supply of the computer monitoring system, and ensure the normal operation of the station management management equipment when the whole system has power supply problems.

The background monitoring device is set in the control room.
2) Network communication layer

Communication medium: The system mainly adopts flame-retardant shielded twisted pair cable, and realizes real-time communication between field device and host computer by RS485 interface and MODBUS communication protocol.

Power medium: The 24V power supply is supplied to all sensors in the field by the host computer through the flame-retardant two-core cable, thus ensuring that the module can keep working under any circumstances.

3) Field device layer

The field device layer is a data acquisition terminal, mainly for AFPM3-2AV series sensors and AFPM3-AV series sensors. The system structure topology is shown on the right:

5. Fire equipment power equipment

5.1, AFPM100 fire equipment power monitoring background:

China Hardware Business Network

The main technical parameters hardware business network information center) http://news.chinawj.com.cn

H7 LED Headlight

H7 Led Headlight,H7 Bulb,H7 Headlight Bulb,H7 Led Lights

CHANGZHOU CLD AUTO ELECTRICAL CO.,LTD , https://www.cld-led.com

Posted on