When you are collecting housing, you must be careful not to find the problem until you have the keys. At this time, go to the developer to solve the problem, then the developer is likely to flicker you, and even do not give you to deal with those problems, so you have to wait until you have no problem collecting the signature on the acceptance form. So, what do Shoufang notes? Notes Shou Fang, what does? Check it out below together with the small series!

What do you need to know about your accommodation and what you need to do

1. What do you need to collect your housing? Everybody must prepare a pen, a book, and a tape measure to measure the area when collecting the house. Measure the area of ​​the house with a tape measure, and then use a pen to record on the book to see whether the area is equal to the area of ​​the purchase contract. Consistently, if the area difference is too much, we must find developers to deal with.

2. What do you need to do when you are collecting your house? Be careful to observe whether the wall is empty or cracking when you pick up your house. At this time, you must prepare tools such as hammers and pastels. For interior walls, use a hammer to strike the wall. If there is a problem with empty sounds, circle it with chalk and inform the developer to deal with it. Pay special attention to the walls of the kitchen and the bathroom, as these two places are to be tiled, and if the walls are empty, they will drop.

3. What do you need to do to close your house? Waterproofing is critical when you close your room. Pay attention to checking the water repellent treatment in your kitchen and bathroom. If you don't do a good job of waterproofing, you will have a water leak problem that will cause unnecessary trouble in the later period.

4. What do you need to know about your accommodation? When checking in, you must check whether the sewer is unobstructed. If you don't check the sewer, the house is completely renovated. It will take a long time to get into the sewer and the water will be blocked. It will be very troublesome. . Therefore, when you close a house, you must go to the sewer to a large amount of water to see if it is smooth. If there is a problem, please ask the developer to deal with it. In most cases, during the renovation process, the workers accidentally got the cement slurry into the sewers, so they had to supervise the work during the renovation.

5. What do you need to do when you close your house? Check the door and window of the house when you pick up the house to see if the door/window switch is convenient. The entrance door must also be inspected. If the entrance door is tilted, the developer will have to deal with it if it is not level. If the entrance door is inside, you need to pay attention to the height of the bottom from the ground is a few centimeters. If the entrance door is less than 5 centimeters, it will easily stick to the floor tiles, and the entrance door will not open. So there are these problems. Must find a developer to deal with.

Article Summary: The above is for small series Shou Fang Shou Fang Information content and matters need to pay attention to explain, for the future to have a comfortable house, Shoufang must be careful, it should also pay attention to the details, there are problems in a timely manner and developers Communicate and deal with it, sign it once again, no problem.

Plant Hydroponics Gutter

Plant Hydroponics Gutter,Pvc Rain Gutter,Plastic Rain Gutter,Grow Pvc Gutter

ZHENHAO BUILDING MATERIALS CO.,LTD , https://www.nbpvcroof.com

Posted on